Section 18

Finley is providing design and construction engineering services to contractor Danya-Cebus, Ltd. for the Shelef and Nilly Bridges in Israel.  This $210 million (U.S.) build-operate-transfer project is part of Section 18 of the new Highway 6, a public-private partnership venture that is Israel’s largest-ever infrastructure project.  Section 18, a 17-kilometer northward extension of the project, includes the construction of four new precast segmental bridge overpass structures. Each new twin bridge will carry two lanes of traffic – a total of four structures and eight lanes. The design also accommodates potential widening, with room for a third box girder between each twin structure.

Services Provided by FINLEY

• Superstructure Design
• Construction Engineering
• Temporary Works Design
• Technical Assistance During Construction

OWNER:
CLIENT:

 

 
Home | FINLEY | Services | Projects | Careers | Contact Us | News & Media
© Finley Engineering Group • 1589 Metropolitan Blvd. • Tallahassee, FL 32308 • 850.894.1600