>> more images

Road 431

The Road 431 Project is a portion of the Cross Israel Highway that consists of a large interchange with six precast segmental box girder bridges. The bridges will be constructed in balanced cantilever and will utilize external tendons for the continuity post-tensioning. This project will be the first use of external post-tensioning tendons on an Israeli bridge structure. The project has over 19,000 sq. m. of deck area with span lengths ranging out to 62m.

Finley Engineering Group is providing superstructure design and construction engineering services. Construction Engineering services include shop drawings, temporary support design, construction analysis, casting geometry, post-tensioning calculations and erection manuals.

Services Provided by FINLEY

• Design
• Construction Engineering

OWNER:
Netivay Hayovel Ltd.
CLIENT:
Cebus Rimon Industrialized Construction Ltd.

 

 
Home | FINLEY | Services | Projects | Careers | Contact Us | News & Media
© Finley Engineering Group • 1589 Metropolitan Blvd. • Tallahassee, FL 32308 • 850.894.1600