Rich Street Bridge. Columbus, Ohio

Services Provided by FINLEY:

  • Construction Engineering
  • Construction Manual
  • Peer Review of Falsework Design
  • Integrated Shop Drawing Review
  • Technical Support during Construction
 

Owner:

Ohio Department of Transportation
 

Client:

Kokosing Construction
 

Photos:

Courtesy of Kokosing Construction
 

Cost:

$32M
 

Start date:

March 2010
 

Completion date:

August 2011
 

Specifications & Details

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

The new bridge replaces a deteriorating historic concrete arch bridge built in 1917, with a modern, post-tensioned precast open-rib arch concrete arch bridge composed of five spans, 10-foot sidewalks and three traffic lanes.

The bridge was built on a new alignment to connect Rich Street on the east to Town Street on the west side of the Scioto River.  The bridge is a 5-span (75’-3”, 135’-10”, 139’-10”, 135’-10 & 75’-3”) precast post-tensioned arch bridge with a total length of 562’.  All bridge components of the arch bridge are precast and post-tensioned.

The construction of this unique arch bridge was complicated due the erection and temporary support of the arch segments which must accommodate the highly variable geometry and inclined forces.  The construction method also required a staged post-tensioning scheme to be developed that supported the large deck precast beams and maintained the stress levels in the arch ribs throughout all construction phases.

FINLEY provided construction engineering services and worked closely with the Contractor’s staff engineers to develop the falsework support system and integrate the support conditions into the construction analysis.  FINLEY also performed an evaluation of the intermediate temporary support foundation stiffness which included a parameter study to ensure that the bridge structure could be erected within a range of anticipated foundation stiffness.

Start date: March 2010
Completion date: August 2011
Cost: $32M

 

 