Covered Bridge over Kennebec River
This project is a 567' long bridge with an AASHTO prestressed concrete beam approach span on either side of a 302' concrete arch span. The bridge is a replacement for the 590 foot long eight span structure consisting of four concrete tied arch thru spans and four concrete T-beam approach spans that carries Route 201 over the Kennebec River with a traffic count of 12,000 vehicles per day. The conceptual sketches and plan details provided were used as the basis for FINLEY's review and estimates for the bridge. We performed a constructibility review, a peer review of the design concept and contract documents; and a contractor's construction estimate and schedule.
Project Images
(Click for larger view)Services Provided by FINLEY:
- Constructibility review services: Peer review of the design and contract documents.
- Prepare the constructibility and the "means and methods" required to construct the design and plans details in accordance with the requirements of the Contract Documents.
- Prepare a contractor's-styled construction estimate and schedule.