The Ayalon Highways form an important link between
two of Tel Aviv’s most important arteries. The bridges
were built over two rail lines and a canal, neither of which
could be disrupted during construction.
The northbound structure, 245m in length, consists of two-box
(126.5m total width) super-structure with spans, varying in
length from 30.8m to 35.0m. The southbound structure is 220m
long, with a single box (16.5m wide) superstructure and spans
from 31.4m to 52.m.
These twin $6.6M (super-structure only) precast segmental
bridges were erected in balanced cantilever with a launching
gantry. This project was the first of its type in over twenty
years to be built in Israel and was the country’s second
segmental structure.
Services
Provided
• Integrated Segment Drawings
• Geometrical Control of Casting, Erection, and Procedural
Manuals
• Casting Curves
• Analysis of Construction Loading
• Design of Erection Equipment and Falsework
• Erection Procedures
• Post-Tensioning Calculations
• One and Off-Site Technical Assistance