MIC / MIA

Located next to Miami International Airport, the Miami Intermodal Center is a massive ground transportation center. Bridge 10-A is a key piece of this $1.4 billon project because it provides access to the 3.4-million sq. ft. Rental Car Center at the airport. FINLEY performed a VECP to the original $8 million contract, a dual box steel superstructure with sub-girder was proposed for the access ramp to the rental car facility.

The value engineering redesign incorporates a 5-span, dual-steel box girder superstructure with a variable width and high degree of curvature. By converting the superstructure to steel and using only one superstructure type, the redesign eliminates the need for falsework.

This greatly simplifies construction and minimizes the impact on ongoing operations and construction projects at the rental facility.

The redesign increased the precast piles from 18 inches to 24 inches, but reduced the number of piles from 163 to 60, and eliminated a span from the project.

The VECP allowed the Contractor to save $750,000 and time, while reducing the impact to the site and improving constructibility, by minimizing the impact of ongoing operations and construction projects at the rental facility.

Final design is completed and construction of the foundations underway. The bridge is scheduled to be completed in November 2008.

Services Provided by FINLEY

• Value Engineering Redesign of  Bridge (Engineer of Record)
• Construction Engineering
• Design of Erection Equipment and Falsework
• On and Off-Site Technical Assistance

OWNER:
Florida Department of Transportation
(District 6)
CLIENT:
GLF Construction

 

 