Projects
Accomplishments at FINLEY include design and construction of over 50 bridges in 50 months. Recently completed
was the design and construction engineering of 16 bridges in Israel including Road 431, Section 18 and the
Benjamina Bridge; 3 large cast-in-place segmental bridges, the Kanawha River Bridge in West Virginia and the
South Fork Eel River – Confusion Hill Bridge in California and 4th Street Bridge (SH96A) over the
Arkansas River in Pueblo Colorado; and 3 steel bridges, Estero Parkway Flyover, Miami Intermodal Center-Bridge
10-A, both value engineered redesign projects in Florida; and the Louisville Waterfront Park Phase III-Big
Four Pedestrian Ramp in Louisville, Kentucky.
The latest construction engineering project for FINLEY is the Chelsea Street Bridge Replacement which broke
ground in March. FINLEY has developed an erection scheme for the new 450 feet long vertical lift bridge that
allows the truss to be erected on-site and launched into its final position. The launch sequence is particularly
challenging as the vertical lift span truss must be in position and raised within 60 hours to re-open this
critical navigational channel in the Chelsea River. FINLEY is designing the specialized launching equipment,
temporary supports and launching geometry.
- Current Projects
- Archives
- Long Span
- Segmental
- Steel
- Arches
- Rapid Transit
- Concrete Beam
- PD&E Study
-
Project Portfolio
- Ayalon Highway Segmental Bridges
- Baldwin Bridge
- Blackwater
- Boston Central Artery - B1
- Boston Central Artery C09A4
- Boston Central Artery C09C1
- C&D Canal Bridge
- Carmel Tunnel Bridges
- Clifford Hollow Bridge
- Creve Coeur
- Evans Crary Bridge
- Foothills Parkway
- Gateway Arch Bridge
- GCRTA Conrail Bridge
- Hanging Lake Viaduct
- HIRAM Bridge
- I-895 Connector Project
- I-95 Richmond
- Kellogg Avenue Viaduct
- LA Metro - Kramer and Rosecrans Bridges
- Le Pont de Brotonne, France
- MARTA CF310
- Natchez Trace
- No 2 Road Bridge
- Otira Viaduct
- Portland LRT
- Presumpscot Falls
- Putnam Street Bridge Replacement
- Puyallup River Bridge
- Roosevelt Bridge
- Sailboat
- Seabreeze
- Sidney Lanier Bridge
- The Big I - I25/I40 Interchange
- WMATA - Branch Route Avenue Station and Line Section 1F0101
* Projects on this page were completed by one or more Principal prior to joining FINLEY.













