FINLEY in the News

Below are various HTML/PDF Articles related to FINLEY.

Web icon Palmetto SR 826/836 The last segment on Bridge 11 was erected a few days ago on the Palmetto SR 826/836 project. July 24, 2012
 
 
Web icon Chelsea Street Bridge Opens May 24, 2012
 
Web icon US281 over the Colorado Bridge, Marble Falls, TX Construction on the first span of the nearly $37 million bridge replacement project is scheduled to finish in November, but all traffic will not move to the new span until February. April 23, 2012
 
 
Web icon FINLEY Announces New Facebook and Linkedin pages Email Blast, April 3, 2012
 
 
Web icon
Smooth Operator Helping Construction At 836/826 Video file, March 27, 2012 7:26 PM
 
 
 
 
 
PDF icon
Israel Moves Forward on Port Expansion and Bridgebuilding
(191.1 KB PDF File)
 
The Motza span is the most complex, part of the planned upgrade of a 16-km stretch of highway that involves two 800-meter precast segmental bridges with three lands in each direction. “The project faces a lot of restrictions due to the nearby archeological sites and need to keep the existing highway open,” says Craig Finley, Finley Engineering's founder and managing principal. 04/10/2013 ENR
Israel Moves Forward on Port Expansion and Bridgebuilding _ ENR_ Engineering News Record _ McGraw-Hill Construction.pdf
 
 
PDF icon
FINLEY's triple bridge design-build success in Israel
(22.4 KB PDF File)
 
http://www.worldhighways.com/sections/general/news/finleys-triple-bridge-design-build-success-in-israel/ First published on April 10, 2013 on www.WorldHighways.com
World Highways - Finley’s triple bridge design-build success in Israel.pdf
 
 
PDF icon
ZweigWhite Top Player. Craig Finley
(165.8 KB PDF File)
 
The Zweig Letter. April 9, 2012. Top Player. Hot Firm Leader Craig Finley. Dogged pursuit of success in his blood.
RCF-ZweigWhiteApril2012.pdf
 
 
PDF icon
New Boston Crossing Will Open Up Room for Dredging
(4.7 MB PDF File)
 
by Johanna Knapschaefer, enr.com January 9, 2012, ENR
Chelsea ENR 1 9 12.pdf
 
 
PDF icon
From Top To Bottom: Top-down construction is getting the thumbs-up on segmental flyover bridges.
(294.1 KB PDF File)
 
Bd&e, Issue 65, December 2011
FromTop to Bottom_Bd&e Issue 65 Dec 2011.pdf
 
 
PDF icon
Why Now? Opportunity and Growth Potential
(664.6 KB PDF File)
 
Florida Engineering Society, September 2011, R. Craig Finley, Jr., P.E., Managing Principal
FINAL SeptJournalFES.pdf
 
 
PDF icon
Burned Bridge Returns in 22 Days
(227.2 KB PDF File)
 
ASPIRE, Summer 2011
ASPIRE Article SR528_Sum11_Web 2pgs.pdf
 
 
PDF icon
Constructing Life While Building Bridges: The Trials and Evolution of Craig Finley, Jr.
(842.8 KB PDF File)
 
Structural Engineer, June 2011, Cover Story
Cover Story SE_print-magazinearticle-constructing_.pdf
 
 
PDF icon
Around-The-Clock Bridge Repair, SR 528 Emergency Bridge Reconstruction in 22 Days
(4.6 MB PDF File)
 
Florida Transportation Builder, Spring 2011
2011 SR528 FTBA Magazine.pdf
 
 
PDF icon
Heavy-Duty Runway Access: Tampa International Airport Taxiway B Bridge
(216.9 KB PDF File)
 
ASPIRE, Winter 2011
ASPIRE_Heavy-Duty Runway Access_Tampa Taxiway B.pdf
 
 
PDF icon
Intelligent Data for Efficient Design and Construction
(1.0 MB PDF File)
 
Rebuilding America's Infrastructure Engineering for Bridges and Roads, December 2010
Rebuilding America's Infrastructure_Pfuntner.pdf
 
 
PDF icon
High Honors for a True Innovator: An Interview with Jacques Combault
(1.6 MB PDF File)
 
Florida Engineering Society Journal, November 2010
FES_Jacques Combault Innovator.pdf
 
 
PDF icon
Seeking Savings - Palmetto Expressway, Miami Florida
(1.1 MB PDF File)
 
Bd&e, Issue 61, November 2010
Seeking Savings_BD&E_Palmetto SR826_836.pdf
 
 
PDF icon
Palmetto Expressway Section 5, Miami-Dade County, Florida
(346.8 KB PDF File)
 
Project Update, ASBI SEGMENTS Newsletter, Issue 56, Winter 2011
Palmetto 826_836 ASBI SEGMENTS 56 winter 2011-2.pdf
 
 
PDF icon
51H Monongahela River Bridge, PA
(118.0 KB PDF File)
 
Project Update, ASBI SEGMENTS Newsletter, Issue 56, Winter 2011
Monfayette_ASBI SEGMENTS 56 Winter 2011.pdf
 
 
PDF icon
Consultant Profile: Blending Design and Construction
(623.0 KB PDF File)
 
ASPIRE, Summer 2010
FINLEY Blending Design and Construction.pdf
 
 
PDF icon
Structural Engineering & Design Top Firms 2010
(779.2 KB PDF File)
 
Structural Engineering & Design. July 2010
2010 Top Structural Engineering Firms.pdf
 
 
PDF icon
FINLEY's Jacques Combault Receives France's Highest Honor
(208.9 KB PDF File)
 
Rebuilding America's Infrastructure, May 10, 2010
RAI Combault Receives France's Highest Honor.pdf
 
 
PDF icon
Rebuilding America's Infrastructure's 2010 Power List
(1.0 MB PDF File)
 
An RAI Exclusive, March 2010
The Power List.pdf
 
 
PDF icon
Home Is Where You Find Work
(1.2 MB PDF File)
 
The Zweigletter, Issue 831, September 28, 2009, Craig Finley, Principal
Home Is Where You Find Work.pdf
 
 
PDF icon
Dawn White Named Director of Marketing At FINLEY Engineering Group
(1.1 MB PDF File)
 
ASBI, SEGMENTS Newsletter, Volume 54, Fall 2009
Segments_V54.pdf
 
 
PDF icon
Jacques Combault presents "The Rion-Antirion Bridge - When a Dream Becomes Reality"
(1.0 MB PDF File)
 
Structural Engineering International, March 2009
Jacques Combault, IABSE Workshop 2009 and Chinese Bridge Tour.pdf
 
 
PDF icon
Building Information Modeling Boosters Are Crossing That Bridge
(28.9 KB PDF File)
 
ENR, August 5, 2009
Building Information Modeling Boosters Are Crossing That Bridge.pdf
 
 
PDF icon
Sustainability - Get In, Get Out and Stay Out, Craig Finley, P.E.
(357.0 KB PDF File)
 
ASPIRE Magazine, Spring 2009
perspective_horsley_spr09.pdf
 
 
PDF icon
Introducing External Tendons to Israeli Bridge Construction
(170.9 KB PDF File)
 
Stucture Magazine, October, 2008, Craig Finley, P.E., Jerry Pfuntner, P.E.
056,057_Israel.pdf
 
 
PDF icon
Avoiding Landslides
(778.3 KB PDF File)
 
ASPIRE Magazine, Summer 2008, Segmental Engineer: Finley Engineering Group, Inc.
confusion_hill_sum08.pdf
 
 
PDF icon
It Answers 2 Greatness
(1.1 MB PDF File)
 
RoadsBridges.com, September, 2008, Craig Finley, P.E., Jerry Pfuntner, P.E.
it_answers_2_greatness.pdf
 
 
PDF icon
On Opposite Coasts
(461.9 KB PDF File)
 
Steel Bridge News, June, 2008, Craig Finley, P.E., Jerry Pfuntner, P.E., Matthew Adams
Steel_article.pdf
 
 
PDF icon
Steel Savings
(1.5 MB PDF File)
 
Bd&e Issue 50, 2008
steel_savings.pdf
 
 
PDF icon
The Full Story
(3.1 MB PDF File)
 
Bd&e Issue 50, 2008
the_full_story.pdf
 
 
PDF icon
A Value Propostion for Bridge Projects
(1.4 MB PDF File)
 
Structural Engineer, June 2008, Craig Finley, P.E.
value_engineering.pdf
 
 
PDF icon
Remembering A Young Engineer that 'Got It'
(441.3 KB PDF File)
 
Bridges May/June, Craig Finley, P.E.
remembering_a_young_engineer.pdf
 
 
PDF icon
Material Decision
(191.7 KB PDF File)
 
gobridges.com, December 10, 2007, Craig Finley, P.E.
material_decisions.pdf
 
 
PDF icon
In Tallahassee Redesign, Steel Makes The Grade
(153.3 KB PDF File)
 
Engineering News-Record, December 3, 2007
steelmakesthegrade.pdf
 
 
PDF icon
Value Engineering Returns $1.85M to Florida County
(1.4 MB PDF File)
 
Modern Steel Construction, December 2007
value_engineering.pdf
 
 
PDF icon
Estero Bridge Case Study - LUSAS
(721.6 KB PDF File)
 
November, 2007
CS440_Estero_Flyover.pdf
 
 
PDF icon
Jacques Combault First Editorial as President IABSE
(1.7 MB PDF File)
 
Structural Engineering International, Winter, 2007
Combault_President_of_IABSE.pdf
 
 
PDF icon
Israel Embraces External Tendons
(170.9 KB PDF File)
 
Bridge Design and Construction, August 8, 2007
056,057_Israel.pdf
 
 
PDF icon
What Does Contingency Mean to You?
(627.1 KB PDF File)
 
ceNews/GoBrdiges.com, August 8, 2007, Craig Finley, P.E.
gobridges_contingency.pdf
 
 
PDF icon
Road 431: Advancing Segmental Bridge Technology in Israel
(898.4 KB PDF File)
 
ASBI, SEGMENTS Newsletter, Project News, Winter 2007, Jerry Pfuntner, P.E.
Segments_V49.pdf
 
 
PDF icon
Advanced Segmental Bridge Technology - Case Study
(1.2 MB PDF File)
 
LUSAS Bridge, June 2007
LUSAS.PDF
 
 
PDF icon
Super Project Managers
(394.8 KB PDF File)
 
Bridges Magazine, January/February 2007, Craig Finley, P.E.
superprojects.pdf
 
 
PDF icon
America Can Build Better Bridges
(1.3 MB PDF File)
 
ENR, November 2006, Craig Finley, P.E.
A_Build_Better_Bridges.pdf
 
 
PDF icon
Design It to Last
(419.2 KB PDF File)
 
Bridges Magazine, September/October 2006, Craig Finley, P.E.
designit.pdf
 
 
PDF icon
Keeping Commitments
(368.9 KB PDF File)
 
Bridges Magazine, May/June 2006, Craig Finley, P.E.
keeping.pdf
 
 
PDF icon
Bridges in Fantasyland
(380.9 KB PDF File)
 
Bridges Magazine, January/February 2006
bridgesinfantasyland.pdf
 
 
PDF icon
Making Connections
(175.7 KB PDF File)
 
A Cable-Stayed Composite Steel and Concrete Bridge Creates a Long-Needed Crossing for Greece's Corinth Strait Modern Steel Construction, December, 2005 Jacques Combault
Making_Connections.pdf
 
 
PDF icon
Design-Build Done Right
(377.3 KB PDF File)
 
Bridges Magazine, September/October 2005, Craig Finley, P.E.
designbuild.pdf
 
 
PDF icon
Is the US Bridge Industry Losing its Edge?
(784.2 KB PDF File)
 
Bridges Magazine, May/June 2005, Craig Finley, P.E.
Bridges Article[2].pdf
 
 
PDF icon
Crossing the Potomac
(1.5 MB PDF File)
 
Structural Engineer, June 2005, Craig Finley, P.E.
Crossing the Potomac.pdf
 
 
PDF icon
Tablet PCs and Handheld Devices Allow Bridge Inspectors to Record Inspection Details in the Field.
(868.8 KB PDF File)
 
CE News, September 2005
CE_News[2].pdf
 
 
PDF icon
Bridge Engineer Opens Finley Engineering Group
(436.7 KB PDF File)
 
Oread Engineer/Kansas Engineer, November 2004
Oread Engineer[2].pdf
 
 
 

You will need a current copy of Adobe Reader to view the PDF files on this page.

If you do not have a current copy of Adobe Reader you can download it below.

Get Adobe Reader